GTY Learning Center

Tips

Dear GTY users or installers, here you can find some general tips before you start using or installing GTY products.

On-Grid Inverter

1)The installation carrier is sturdy and can bear the weight of the inverter for a long time.

2)It is recommended that the installation ambient temperature be lower than 50°C and the ventilation should be good.

3)In order to ensure the best operation, it is necessary to avoid direct sunlight, rain and snow.

4)During operation, the case temperature will be relatively high, please do not install the inverter in a place where it is easy to touch.

5)The space around the inverter must meet the installation, maintenance and heat dissipation requirements.

Vertical installation/ Do not allow lying down/ Leaning back and inversion

1)Do a good job of line marking to reduce the probability of errors

2)Before connecting to the inverter, use a multimeter to measure the input voltage of the component on the positive and negative sides to ensure that the polarity is correct and does not exceed the maximum input voltage

3)Use special crimping tools for photovoltaic terminals

4)If conditions permit, you can use an infrared thermal imager or a spot temperature gun to confirm the connection point temperature after grid-connected power generation.

1)Tighten the cable gland

2)Idle interfaces are sealed

3)The cable entry cover is closed

4)Conduit sealing treatment

5)Confirm and lock the waterproof cap

1)Weather Reason

2) Ambient Temperature

3)Component Orientation

4)Distance Between Components

5)Component Inclination

6)Dust Shielding

7)Component mismatch

8) Component Virtual Label

9)Grid Instability

10) Inverter Reports Fault

1)Poor Wi-Fi signal

2)GPRS signal is not good

3)Home broadband arrears

4)Problems with router settings

5)Router failure

6)The router is overloaded

7)The module interface is loose

8)Mixed wiring of communication lines and power lines

9)Communication module failure

10)Inverter failure

Energy storage system

There are 4 types of EPS modes, they are:
0 – Disable
1 – EPS without bypass:only in the case of power failure, EPS port will have voltage output (basically no standby power consumption)
2 – EPS with bypass:When there is power grid, EPS port will also have voltage output, and when power failure, EPS port voltage will need about 2s for output switch (low power standby power consumption).
3 – UPS with bypass:EPS port also has voltage output when there is power grid, and UPS mode output when power failure, EPS port voltage needs <20ms time for switching (high power standby power consumption)

After the battery is installed for the first time, you are advised to charge the battery forcibly (for calibration Battery).

EV charger

1)When the charger is connected to the power line, the front end must be forcibly connected to a Type A/30mA RCBO.

2)The default Bluetooth name of the charger is AC – {SN last 8 digits}, and the default password is 111111.

3)Installation environment Requirements
-The installation position of charger shall not be close to dangerous positions such as water pipe, gas pipe and steam pipe.
-The charger shall not be installed in places with severe vibration or high temperature.
-The installation position of charger should not be set in low-lying places where it is easy to accumulate water or drip.
-It is recommended that the charger be installed in an environment with sunshade or umbrella.
-A certain space shall be reserved for the installation of charger to facilitate the inspection and maintenance of technicians.

*Including but not limited to the above.

4)The length of the vehicle connector is 5m by default, which can meet the daily charging use. Special length requirements can be customized.

FAQ

Dear GTY users or installers, here you will find our most frequently asked questions and their answers, which we have grouped together in order to help you solve your problems quickly.

On-Grid Inverter

[/fusion_table]Different models have different requirements, the specific reference is as below:(Top) (bottom) (Left) (Right)

1-36kW >500mm >600mm >200mm >200mm

50-60kW >600mm >600mm >400mm >400mm

(Front)

1Phase >500mm

3Phase >1000mm

1)It is recommended to connect the protective grounding and the PE terminal of the AC wiring at the same time.

2)The diameter of the protective grounding cable should be the same as that of the AC output PE cable.

3)In order to improve the anti-corrosion performance, it is recommended to apply silicone or paint on the outside of the ground terminal for protection.

4)Near-end grounding is recommended. For a system with multiple inverters connected in parallel, ensure that each grounding wire is connected to the same potential.

1) When connecting photovoltaic modules to the inverter, the Amphenol H4 photovoltaic special connector provided with the inverter should be used. Compatible models may not guarantee long-term effective contact of metal terminals.

2) When crimping the positive metal terminal, do not also crimp the limit stop bar, otherwise the metal terminal will not be stuck, resulting in “heading”

3)Strictly prevent the reverse polarity of the DC input. It is forbidden to connect the single group in series in the same MPPT. Make sure that the terminal is correct before inserting the terminal into the inverter (it is recommended to use a multimeter to measure)

1)Pay attention to the correct connection of the neutral wire polarity

2)It is forbidden to connect the load to the output terminal of the inverter without passing through the circuit breaker;

3)Each inverter needs to be equipped with an independent circuit breaker to ensure safe disconnection from the grid

4)When using multiple single-strand cables for AC output, use fireproof mud to seal the gap between the sealing ring and the cable after wiring is completed.

5)When a large number of single-phase output inverters are connected to the same low-voltage transformer in the three-phase power grid, attention should be paid to the reasonable distribution of the inverters among the three phases, and the load balance of the three phases should be maintained as much as possible to avoid the failure of a certain phase due to insufficient consumption. The phase voltage rises and damages the electrical equipment;

1)Make sure to use terminal blocks for lock wire

2)Make sure the terminals are locked

3)Do not lock the screw to the cable insulation

Energy storage system

Start for On-Grid:Grid→EPS→PV→Battery

Start for Off-Grid:Battery→PV→EPS→Grid

When the inverter is turned on, the NET light is off because the router is not connected. The COM light is on because the collector is connected to the inverter. The READY light flashes slowly (1s on and 1s off), which means the collector usually runs.

1)It is recommended to connect the protective grounding and the PE terminal of the AC wiring at the same time.

2)The diameter of the protective grounding cable should be the same as that of the AC output PE cable.

3)In order to improve the anti-corrosion performance, it is recommended to apply silicone or paint on the outside of the ground terminal for protection.

4)Near-end grounding is recommended. For a system with multiple inverters connected in parallel, ensure that each grounding wire is connected to the same potential.

Search for the keyword Propower from Google Play Store or Apple AppStore, download and install the latest version software for free.

Connect to the Logger’s network (Wi-Fi name is AP_*******)

Wi-Fi name and Password in Logger`s positive

A cell phone connects to the Logger’s Wi-Fi

Search the inverter list, and connect to the target inverter

If it is successfully connected, the home page will show the general status of the inverter

Go to setting page, choose Inverter Commands.

Then click on the Time&Date Sync icon to Synchronize system time for inverter

Let end customers use mobile phones to download and installation Solarman App

Click Register to enter end client user name, email address, password, and click Register to Register end client user account

registering the account,Click + to build Plant

Automatically pops up the scan interface and scans Wi-Fi Logger SN for Build Plant

Please fill in Plant Address、Capacity、Currency、name and your Contact information.Click Complete to build Plant

EV charger

1)Q:A0070230E11, A0070230E12, A0110400E11, A0220400E11 are applicable to EVs with which inlets?
A: XXXXXXXXE11 is applicable to Type 2 inlet EVs, and XXXXXXXXE12 is applicable to Type 1 inlet EVs.

2)Q:What are the start & stop control modes of AC charger?
A:The default mode is APP controlled start & stop, which supports plug & play and card swiping start & stop.

3)Q:How long can the AC charger fully charge the EV?
A:This depends on the battery capacity of the EV. For example, for a 43kWh battery, 7kW charger needs to be charged for 7h, 11kW charger needs to be charged for 4h, and 22kW charger needs to be charged for 2h.

4)Q:Does AC charger support cloud connection?
A:It is not connected to the cloud by default and supports 4G / WiFi / Ethernet connection to the cloud.